Daily Workload

Line Maintenance · Production Planning
ⓘ
0A/C with work
0Tasks
0Scheduled checks
0High priority
0Out of service
0On the note
Connecting
A/C Reg WO / DDL Description Priority STN Scheduled maintenance Ground time Remarks Assignment Status

No aircraft on this shift yet.

Pick a registration below to add its first line.

    Type any part of a registration — buv finds SU-BUV. Use + on a row for a second task on the same aircraft — station and ground time come across by themselves, and × in the list to take a wrong registration back off the fleet.

    Out of service · standing remarks

      These carry over to every shift and print as a row with the remark filled in. Clear the text and press Set to remove one.

      Note at the foot of the sheet

        This prints as a boxed note under the table — the registrations on one line and the wording in bold beneath them. It is not part of the workload grid, it stays on every shift until you clear it, and these aircraft can still carry ordinary lines above.

        Workload history

        Everything ever written on a workload sheet is kept. Pick a period and an aircraft — or a whole fleet type — and the report lists every task that went out on it, with the date it was carried out, the shift that did it, the work order, the check and the status.

        Fleet register

        Which aircraft is a NEO and which is a CEO. The reports read the type from here, so a new aircraft only has to be marked once — every report after that counts it in the right fleet.

        A/C Reg Fleet type Standing remark

        People

        Everyone who may open this app, and what each of them is allowed to do. Line maintenance sees the shift and may write the remark and the status — nothing else, and that is enforced by the server, not just hidden on the page.

        They sign in with that password and are asked to change it straight away. Give it to them face to face — it is never shown again.
        Name Email Role Last signed in

        Daily Workload

        Line Maintenance · Production Planning

        Choose a password

        You are signed in with the password you were given. Pick one of your own before you carry on.

        DAILY WORKLOAD Line Maintenance · Production Planning
        NIGHT SHIFT
        --:----
        UTC--:--:--
        CAI
        ALYHRGATZ
        SSHHMBRMF
        All Times Shown Are In Local Time
        ⚠
        ⚠
        LM Shift Leader —
        Crew —
        Prepared by —